WEST CREEK WATERSHEDRESTORATION SITE 8 We realigned and slightly raised the channel invert and graded the creek banks to a more stable angle. This phase included a moderately meandering step/riffle channel. Details 2012NEORSD Categories Watershed Conservation We...
WEST CREEK WATERSHEDCONSERVATION CUYAHOGA RIVER RESTORATION – SITE 9 We repaired scouring in the natural bedrock by raising the channel invert through the upstream portion of the site to tie-in with the elevation of the weir at the culvert invert. Details...
WEST CREEK WATERSHED RESTORATION SITE 11 Site 11 was primarily impaired due to the presence of a low head dam. We completely removed the dam and installed grade controls. Details Cuyahoga River Restoration Categories Watershed Conservation Due to the natural bedrock...
CLEVELAND FLOODPLAIN WEST CREEK CONFLUENCE We led this challenging design/build stream restoration project to stabilize and rehabilitate 1,000 feet of stream and convert contiguous land areas into stormwater-treatment wetlands and hydraulically connected floodplains....
BLACK RIVER RESTORATIONLORAIN BLACK RIVER WATERSHED Our team restored approximately 8,200 LF along the lower Black River corridor and restored the habitat to pre-steel mill conditions. Details 2010-2011Ohio EPA under the American Recovery and Reinvestment Act (ARRA)...
FORT WAYNE RIVER RESTORATION SPY RUN CHANNEL IMPROVEMENTS We partnered with ODNR to excavate and remove 300,000 cubic yards of soil along the South Fork Licking River to mitigate flooding in the Buckeye Lake Community. Details 2015The City of Fort WayneFort Wayne, IN...
Recent Comments