by Holly Keyser | Aug 24, 2019 | Mass Excavation, Site Work
MIDDLEGROUNDS METROPARK TOLEDO RESTORATION – SITE 8 We helped to transform this former shipping rail yard in Toledo into the new Middlegrounds MetroPark. The 28 acre greenspace is located on the west side of the Maumee River, west of the Anthony Wayne Bridge....
by Holly Keyser | Aug 15, 2019 | Floodplain, Watershed Restoration
CLEVELAND FLOODPLAIN WEST CREEK CONFLUENCE We led this challenging design/build stream restoration project to stabilize and rehabilitate 1,000 feet of stream and convert contiguous land areas into stormwater-treatment wetlands and hydraulically connected floodplains....
by Holly Keyser | Aug 14, 2019 | Lake Erie Erosion
SANDUSKYREVETMENT LION’S PARK PHASES 1 AND 2 We installed approximately 1000 tons of 601A and 601B rock to stabilize the eroding shoreline behind Lions Park. Details 2019Lion’s Park Categories RevetmentLake Erie ErosionSandusky The bluff was reshaped,...
by Holly Keyser | Jul 27, 2019 | Floodplain
LICKING RIVER FLOODPLAIN BUCKEYE LAKE, OH We partnered with ODNR to excavate and remove 300,000 cubic yards of soil along the South Fork Licking River to mitigate flooding in the Buckeye Lake Community. Details ODNRBuckeye Lake, OH Categories FloodplainExcavation Soil...
by Holly Keyser | Jul 13, 2019 | Sediment Removal
CRESTON, OH SEDIMENT REMOVAL FALL CREEK RESERVOIR We worked with the Muskingum Watershed Conservancy District to restore Fall Creek Reservoir in Creston, Ohio, Wayne County. Details 2010Muskingum Watershed Conservancy DistrictRehabilitation Structure IV-A Categories...
by Holly Keyser | Jul 9, 2019 | Sediment Removal
SEDIMENT REMOVAL WESTLAKE WEST CREEK CONFLUENCE The Water’s Edge Homeowners association contacted us about their sediment issue, so we got to work. Details Water’s Edge Condo AssociationWestlake, Ohio Categories Sediment Removal The sediment had...
by Holly Keyser | Jun 23, 2019 | Habitat Restoration
LORAIN HABITAT RESTORATION BLACK RIVER WATERSHED We constructed 3,000+ linear feet of fish habitat shelves on the Black River Watershed. Details 2010 – 2011City of Lorain Categories Habitat RestorationLorain In addition to constructing 3,000+ linear feet of fish...
by Holly Keyser | Jun 3, 2019 | Sediment Removal
SEVILLE, OH SEDIMENT REMOVAL FALL CREEK RESERVOIR We worked in Seville, Ohio, Medina County to remove over 12,000 CY of sediment from the Chippewa Flood Control Dam IV-A, Fall Creek Reservoir. Details 2010Muskingum Watershed Conservancy DistrictRehabilitation...
by Holly Keyser | May 29, 2019 | Floodplain, Habitat Restoration, Mass Excavation, Watershed Restoration
BLACK RIVER RESTORATIONLORAIN BLACK RIVER WATERSHED Our team restored approximately 8,200 LF along the lower Black River corridor and restored the habitat to pre-steel mill conditions. Details 2010-2011Ohio EPA under the American Recovery and Reinvestment Act (ARRA)...
by Holly Keyser | May 18, 2019 | Lake Erie Erosion
LAKE ERIE SAND RELOCATION LORAIN BEACH RESTORATION We worked with a local private beach in Lorain to improve conditions and give guests a better experience. In short, we imported large quantities of sand on a barge from Canada and used our specialized marine...