by Holly Keyser | Nov 20, 2019 | Lake Erie Erosion, Parks
SIMS PARKEROSION CONTROL EROSION CONTROL, TRAIL BUILDING, AND RETAINING WALL CONSTRUCTION We recently completed Phase 1 of a 2-phase project to revitalize the lakefront in Euclid at Sims Park. The goal? Protect against erosion, boost tourism, and develop the...
by Holly Keyser | Nov 19, 2019 | Lake Erie Erosion
ASHTABULAEROSION WORK REVETMENT & SHORELINE PROTECTION After severe conditions eroded a 1.5 mile stretch of the Lake Erie shoreline along ST RT 531 in Ashtabula, we got to work placing 50,000 tons of revetment stone, widening the roadway, and installing 5000′ of...
by Holly Keyser | Sep 21, 2019 | Lake Erie Erosion
MADISONEROSION CONTROL ARMOR STONE REVETMENT AT TOWNLINE PARK Our team used 16,000 tons of 3-5 ton Armor stone to construct an Armor stone revetment. Details Madison Townline Park2017 Categories RevetmentLake Erie Erosion For this revetment project, we cleared...
by Holly Keyser | Aug 14, 2019 | Lake Erie Erosion
SANDUSKYREVETMENT LION’S PARK PHASES 1 AND 2 We installed approximately 1000 tons of 601A and 601B rock to stabilize the eroding shoreline behind Lions Park. Details 2019Lion’s Park Categories RevetmentLake Erie ErosionSandusky The bluff was reshaped,...
by Holly Keyser | Apr 18, 2019 | Lake Erie Erosion
PUBLIC BOAT LAUNCH HURON, OH BOAT RAMP CONSTRUCTION Located on the city of Huron’s harbor front, we constructed Huron’s Free, Public-Access Boat Ramp complete with a 4-Lane Boat Ramp Launch Facility, Handicapped-Accessible Docks, Restrooms and Parking for...
Recent Comments