by Holly Keyser | Aug 24, 2019 | Mass Excavation, Site Work
MIDDLEGROUNDS METROPARK TOLEDO RESTORATION – SITE 8 We helped to transform this former shipping rail yard in Toledo into the new Middlegrounds MetroPark. The 28 acre greenspace is located on the west side of the Maumee River, west of the Anthony Wayne Bridge....
by Holly Keyser | Aug 15, 2019 | Floodplain, Watershed Restoration
CLEVELAND FLOODPLAIN WEST CREEK CONFLUENCE We led this challenging design/build stream restoration project to stabilize and rehabilitate 1,000 feet of stream and convert contiguous land areas into stormwater-treatment wetlands and hydraulically connected floodplains....
by Holly Keyser | Aug 14, 2019 | Lake Erie Erosion
SANDUSKYREVETMENT LION’S PARK PHASES 1 AND 2 We installed approximately 1000 tons of 601A and 601B rock to stabilize the eroding shoreline behind Lions Park. Details 2019Lion’s Park Categories RevetmentLake Erie ErosionSandusky The bluff was reshaped,...
by Holly Keyser | Jul 27, 2019 | Floodplain
LICKING RIVER FLOODPLAIN BUCKEYE LAKE, OH We partnered with ODNR to excavate and remove 300,000 cubic yards of soil along the South Fork Licking River to mitigate flooding in the Buckeye Lake Community. Details ODNRBuckeye Lake, OH Categories FloodplainExcavation Soil...
by Holly Keyser | Jul 13, 2019 | Sediment Removal
CRESTON, OH SEDIMENT REMOVAL FALL CREEK RESERVOIR We worked with the Muskingum Watershed Conservancy District to restore Fall Creek Reservoir in Creston, Ohio, Wayne County. Details 2010Muskingum Watershed Conservancy DistrictRehabilitation Structure IV-A Categories...