by Holly Keyser | Nov 20, 2019 | Parks
COLUMBUS DRAINAGE REPAIR COLUMBUS PARKS AND RECREATION A drainage issue has inhibited the falls at Franklin Park Cascades tremendously since 2016. We’re fixing the problem. Details 2019Columbus Parks and Recreation Categories ColumbusRiver Restoration To correct...
by Holly Keyser | Nov 20, 2019 | Lake Erie Erosion, Parks
SIMS PARKEROSION CONTROL EROSION CONTROL, TRAIL BUILDING, AND RETAINING WALL CONSTRUCTION We recently completed Phase 1 of a 2-phase project to revitalize the lakefront in Euclid at Sims Park. The goal? Protect against erosion, boost tourism, and develop the...
by Holly Keyser | Nov 20, 2019 | Lake Erie Erosion, Parks
HOWARD MARSHMETROPARK TOLEDO SITE WORK, TRAIL BUILDING, AND MASS EXCAVATION This wetland restoration project has been in the making for nearly a decade and is part of an ongoing vision to see 1,000-acres of coastal wetlands restored. Details Howard...
by Holly Keyser | Nov 19, 2019 | Lake Erie Erosion
ASHTABULAEROSION WORK REVETMENT & SHORELINE PROTECTION After severe conditions eroded a 1.5 mile stretch of the Lake Erie shoreline along ST RT 531 in Ashtabula, we got to work placing 50,000 tons of revetment stone, widening the roadway, and installing 5000′ of...
by Holly Keyser | Oct 15, 2019 | Watershed Restoration
WEST CREEK WATERSHEDCONSERVATION CUYAHOGA RIVER RESTORATION – SITE 9 We repaired scouring in the natural bedrock by raising the channel invert through the upstream portion of the site to tie-in with the elevation of the weir at the culvert invert. Details...
Recent Comments