by Holly Keyser | Jan 6, 2020 | Uncategorized
BEDFORD HEIGHTS STREAM RESTORATION TINKERS CREEK In order to prevent flooding in Bedford Heights’ commercial district and protect Tinkers Creek, we reconstructed Tinkers Creek near the Bedford Transportation Department. Details Tinkers Creek Categories Bedford...
by Holly Keyser | Nov 5, 2019 | Watershed Restoration
WEST CREEK WATERSHEDRESTORATION SITE 8 We realigned and slightly raised the channel invert and graded the creek banks to a more stable angle. This phase included a moderately meandering step/riffle channel. Details 2012NEORSD Categories Watershed Conservation We...
by Holly Keyser | Oct 15, 2019 | Watershed Restoration
WEST CREEK WATERSHEDCONSERVATION CUYAHOGA RIVER RESTORATION – SITE 9 We repaired scouring in the natural bedrock by raising the channel invert through the upstream portion of the site to tie-in with the elevation of the weir at the culvert invert. Details...
by Holly Keyser | Sep 15, 2019 | Watershed Restoration
WEST CREEK WATERSHED RESTORATION SITE 11 Site 11 was primarily impaired due to the presence of a low head dam. We completely removed the dam and installed grade controls. Details Cuyahoga River Restoration Categories Watershed Conservation Due to the natural bedrock...
by Holly Keyser | Aug 15, 2019 | Floodplain, Watershed Restoration
CLEVELAND FLOODPLAIN WEST CREEK CONFLUENCE We led this challenging design/build stream restoration project to stabilize and rehabilitate 1,000 feet of stream and convert contiguous land areas into stormwater-treatment wetlands and hydraulically connected floodplains....
Recent Comments