by Holly Keyser | Jan 6, 2020 | Uncategorized
BEDFORD HEIGHTS STREAM RESTORATION TINKERS CREEK In order to prevent flooding in Bedford Heights’ commercial district and protect Tinkers Creek, we reconstructed Tinkers Creek near the Bedford Transportation Department. Details Tinkers Creek Categories Bedford...
by Holly Keyser | Nov 20, 2019 | Parks
COLUMBUS DRAINAGE REPAIR COLUMBUS PARKS AND RECREATION A drainage issue has inhibited the falls at Franklin Park Cascades tremendously since 2016. We’re fixing the problem. Details 2019Columbus Parks and Recreation Categories ColumbusRiver Restoration To correct...
by Holly Keyser | Nov 20, 2019 | Lake Erie Erosion, Parks
SIMS PARKEROSION CONTROL EROSION CONTROL, TRAIL BUILDING, AND RETAINING WALL CONSTRUCTION We recently completed Phase 1 of a 2-phase project to revitalize the lakefront in Euclid at Sims Park. The goal? Protect against erosion, boost tourism, and develop the...
by Holly Keyser | Nov 20, 2019 | Lake Erie Erosion, Parks
HOWARD MARSHMETROPARK TOLEDO SITE WORK, TRAIL BUILDING, AND MASS EXCAVATION This wetland restoration project has been in the making for nearly a decade and is part of an ongoing vision to see 1,000-acres of coastal wetlands restored. Details Howard...
by Holly Keyser | Nov 19, 2019 | Lake Erie Erosion
ASHTABULAEROSION WORK REVETMENT & SHORELINE PROTECTION After severe conditions eroded a 1.5 mile stretch of the Lake Erie shoreline along ST RT 531 in Ashtabula, we got to work placing 50,000 tons of revetment stone, widening the roadway, and installing 5000′ of...
by Holly Keyser | Nov 5, 2019 | Watershed Restoration
WEST CREEK WATERSHEDRESTORATION SITE 8 We realigned and slightly raised the channel invert and graded the creek banks to a more stable angle. This phase included a moderately meandering step/riffle channel. Details 2012NEORSD Categories Watershed Conservation We...
by Holly Keyser | Oct 15, 2019 | Watershed Restoration
WEST CREEK WATERSHEDCONSERVATION CUYAHOGA RIVER RESTORATION – SITE 9 We repaired scouring in the natural bedrock by raising the channel invert through the upstream portion of the site to tie-in with the elevation of the weir at the culvert invert. Details...
by Holly Keyser | Oct 9, 2019 | Client Reviews
OUR LETTERS OFREFERENCE CLIENT REVIEWS We strive to deliver a best-in-class experience to all of our clients. But, don’t take our word for it. We’re including client reference letters so you can know what it’s really like to work with us –...
by Holly Keyser | Sep 21, 2019 | Lake Erie Erosion
MADISONEROSION CONTROL ARMOR STONE REVETMENT AT TOWNLINE PARK Our team used 16,000 tons of 3-5 ton Armor stone to construct an Armor stone revetment. Details Madison Townline Park2017 Categories RevetmentLake Erie Erosion For this revetment project, we cleared...
by Holly Keyser | Sep 15, 2019 | Watershed Restoration
WEST CREEK WATERSHED RESTORATION SITE 11 Site 11 was primarily impaired due to the presence of a low head dam. We completely removed the dam and installed grade controls. Details Cuyahoga River Restoration Categories Watershed Conservation Due to the natural bedrock...